Railway infrastructure

Modernisation of railway line no. 008, Stage I; Warszawa Zachodnia – Warszawa Okęcie section and construction of a railway link from Warszawa Służewiec to Okęcie Airport; Stage II: construction works on the Warszawa Zachodnia – Warszawa Okęcie section

Investor: PKP PLK S.A.

Project description:

  • track works: earth works on the track, delivery of a protective sandy gravel layer with embedded geofibre and a distributed reinforcing geogrid, slopes shielded with openwork panels, delivery of a lower semi-layer of rubble
  • drainage works: delivery of drainage ditches reinforced with concrete gutters, underground passage

Period of delivery: 23rd July 2007 - 31st July 2008

Realizacja: Agencja WMC