Reconstruction And Modernization Of E-30 and CE30 Railways

Reconstruction And Modernization Of E-30 and CE30 Railways Along The Section Legnica – Wrocław – Opole, Route Środa Śląska – Malczyce Track No. 1 And 2 Together with Malczyce Station

Investor: PKP Polskie Linie Kolejowe S.A.

Project description:

• Modernization of the E-30 railway, adapting it to technical standards allowing speeds of up to 160 km/h for passenger trains and 120 km/h for cargo trains.

TRACK WORKS:

• Installation of tracks on prestressed concrete ties PS94 – 24.3 km

• Hub installation – 43 pcs.

• Modernization of passages

• Construction of a collector – 1 920 m

TRACTION NETWORK:

• Installation of traction network – 23 km

• Installation of traction poles (407 pcs.) and traction gate (19 pcs.)

ENGINEERING WORKS:

• Construction and modernization of platforms 200 m long, together with small architecture elements

• Construction of tunnel passageway with ramps for the disabled

• Construction of road culverts (8 pcs.), modernization of rail culverts (7 pcs.)

• Securing slopes

Completion date: 6th March 2009 – 30th June 2011

Gross contract value: PLN 208 982 075,84